Treatment Centre

Location: Chelsea & Westminster NHS Foundation Trust

The redevelopment began in March 2024, designed to boost the centre’s footprint by over 70%, while preserving seven operating theatres and adding two new state-of-the-art theatres. A new overnight recovery area was introduced, enabling more complex procedures to be handled as short-stay or day cases, reducing the need for inpatient admissions. The therapies outpatient department was relocated to the lower ground floor, creating space for the expanded facilities. Funded in part by the CW+ charity, the redesigned layout offered a more welcoming environment for patients and improved working conditions for staff. These upgrades resulted in shorter waits, better access to advanced procedures, and more efficient care, all while keeping the centre operational throughout construction.

‘ Logan Construction (SE) LTD appointed Stirling Medical as their preferred contractor and manufacturer of all fixed furniture and fittings throughout our project for Chelsea and Westminster Hospital Treatment centre development. It has been a great pleasure working with the professional team from Stirling at every stage of the project from estimating and costing, through to design / manufacturing and finally delivery and installation on site. Stirling's commitment to deliver the best product and site installation is a testimony of their long lasting experience working with NHS. Our relationship with Stirling throughout the various phases provided a solid ground for a smooth delivery and even the minor ‘last minute’ variations that were required got dealt with in a timely and professional manner.’
Logan Construction (SE) LTD

Need some assistance?

Call us on 020 8699 8993 to speak to one of our project consultants.